22 Pușkin St.: an entire floor of government offices, rebuilt with the building in use

Repair of the 5th floor of the administrative building at 22 A. Pușkin St., Chișinău, for the General Directorate for the Administration of Government Buildings.

new boardLED lighting
Project sheet
Client
General Directorate for the Administration of Government Buildings
Location
Chișinău, 22 A. Pușkin St.
Period
contract awarded in July 2026
Type of work
capital repair, finishes and building services
Funding
state budget, public procurement (MTender)
Status
completed
Site photographs
Chișinău, 22 A. Pușkin St. · 1
Site photoChișinău, 22 A. Pușkin St. · 1
Chișinău, 22 A. Pușkin St. · 2
Site photoChișinău, 22 A. Pușkin St. · 2
Chișinău, 22 A. Pușkin St. · 3
Site photoChișinău, 22 A. Pușkin St. · 3

Context

An entire floor of an administrative building in central Chișinău, with offices and circulation areas, had to be brought up to the current standard: new finishes, rebuilt services, efficient lighting. The building remains in use for the whole duration, with controlled access and a strict timetable.

The task

The specification called for the complete repair of the 5th floor, including indoor electrical networks designed from scratch (design 031/2026-EEF/IEI): new distribution boards, lighting and socket circuits, LED luminaires, with all tests and as-built documentation. The deadline is fixed and every item in the estimate is backed by a norm.

The solution

We divided the floor into zones, with a schedule posted on site so that staff know each week where work is taking place. The preparation crew demolished and removed waste outside office hours; services were installed before finishes, and every circuit was labelled at both ends. Materials arrive in our own transport, unloaded at times agreed with building security.

The result

At handover the client received a floor with new finishes, efficient LED lighting, electrical boards with updated diagrams and test reports, plus the technical book and the reports for every concealed work. For us, the project confirms that the discipline of small sites works in an occupied government building too.

Projects

All projects

All projects
Interior repairsCompleted

Repair of the 5th floor — administrative building at 22 A. Pușkin St., Chișinău

General Directorate for the Administration of Government Buildings · July 2026
Chișinău municipality
View case study

Do you have a tender specification or a job that needs doing?

Send it to us and we will come back with an estimate within 24 hours. For private works we visit the site within 48 hours.

Quick contact

Leave your number and we will call you back on the same working day

Your number is sent via WhatsApp or e-mail; we use it for nothing else.