- Home
- Projects
Our projects
Every project in the list has a contract, an acceptance report and a client who can be called. On the map, every dot is a project; click it to see the works.
Project map
Every dot is a completed project. Click a dot to see the work.
2026 projects
- Government building: sanitary facilities, stage II · 2026
- 162 Ștefan cel Mare Blvd.: toilets · 2026
- 22 A. Pușkin St.: repair of the 5th floor · 2026
- State University, 20 Pădurii St.: water networks · 2026
- State Chancellery vehicle depot: car park repair · 2026
- Government buildings: air conditioners · 2026
- Institute of Emergency Medicine: networks for a CT scanner · 2025
- Consultative Diagnostic Centre, 11 Alecu Russo St.: radiodiagnostic laboratory · 2025
- Institute of Emergency Medicine: networks for sterilisation equipment · 2024
- State University, Institute of Chemistry: heating networks · 2024
- Intelligence and Security Service, 86 Petricani St.: capital repair of the car park
- Park: landscaping of the public space, stage I · 2026
- Sanitary facilities · 2025
- Gymnasium: sanitary facilities and wastewater storage · 2026
- Water treatment and filtration stations · 2026
- Primary school: two sanitary blocks (UNICEF) · 2026
- Gymnasium: two sanitary blocks (UNICEF) · 2026
- Water disinfection station (European Village, FNDRL)
- "Mihai Eminescu" Lyceum: sanitary facilities and sanitaryware (UNICEF) · 2026
- Gymnasium: sanitary facilities · 2026
- Gymnasium: sanitary facilities and wastewater storage · 2026
- Gymnasium: toilets, water, sewerage, ventilation · 2026
- Lyceum: toilets, water, sewerage, ventilation · 2026
Earlier projects
- Paving of the town pavements · 2025
- Footpath in "Biruința" Park
- Completed project · 2025
- Completed project · 2025
- Completed project · 2025
- Completed project · 2025
- Kindergarten No. 214: renewal of networks, stage 3 · 2024
- Water treatment system at the source, 10 m³/h (Embassy of Japan) · 2024
- "Maria Bieșu" School of Arts: plumbing, gas, heating, air conditioning · 2023
- School of Arts: sculpture workshop · 2024
- School of Arts: 3 classrooms · 2024
- Penitentiary No. 1: water filtration and treatment system
- Educational Centre, Dormitory No. 2: repair · 2024
- "Pan Halippa" Lyceum: 3rd-floor corridor (dormitory) · 2024
- "A. Pușkin" Lyceum: sanitary facilities (ONDRL programme) · 2024
What a project seen through to the end looks like
Five projects told briefly: what we were given, what we did, what we left behind.
22 Pușkin St.: an entire floor of government offices, rebuilt with the building in use
Repair of the 5th floor of the administrative building at 22 A. Pușkin St., Chișinău, for the General Directorate for the Administration of Government Buildings.
View case studyPeticeni and Sipoteni: modern sanitary blocks in three schools, funded by UNICEF
Four contracts in the same district in two years: the water disinfection station in Peticeni, then the sanitary blocks in the primary school, the gymnasium and the Sipoteni lyceum.
View case studyTelița: drinking water for a whole village, 10 m³ per hour, with Japanese funding
A water treatment system right at the source, funded by the Embassy of Japan and handed over to Telița Town Hall in 2024.
View case study"Maria Bieșu" School of Arts: three contracts in two years with the same client
First job: plumbing, gas, heating and air conditioning. Second: the sculpture workshop. Third: three classrooms. All in Ștefan Vodă, for the same school.
View case studyCiobanovca: water treatment and filtration stations for a commune in Anenii Noi
The company's fourth water treatment project, contracted by Ciobanovca Town Hall in June 2026.
View case studyDo you have a tender specification or a job that needs doing?
Send it to us and we will come back with an estimate within 24 hours. For private works we visit the site within 48 hours.